Categories

220v Single pahse 6KW server simulator pure Rresistive AC Dummy load bank

category: Power Measuring Instrument

reference price:¥$700.00 - $750.00

Purchase quantity
- +

Xi'an Foresight Electronic Technology Co., Ltd.

Mr. Lee
Product details Company introduction
Parameter information

 

Product Description

 

Why need load bank testing

It is really critical to ensure that your standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located in harsh, dusty or corrosive environment working in good condition, when you need them most, if switched to be loaded when the main power supply in maintenance procedure or stop abnormally.

 

 

 

FORESIGHT AC/DC load banks applications

Ø  Battery bank system

Ø  Energy storage system

Ø  Energy meter loop load test

Ø  Datacenter rack heat simulating

Ø  PV system Inverter anti-islanding test

Ø  Voltage regulator, rectifier aging load test

Ø  Genset, UPS load bank commission testing

Ø  AC/DC power supply, power source commission acceptance test 

FORESIGHT series load banks loading elements (load bank types)

Alloy resistors, inductors & capacitors loading elements are combined used in FORESIGHT series AC/DC load bank as per clients’ need in different applications:

Ø  Pure resistive AC load bank

Ø  Pure resistive DC load bank

Ø  RCD non-linear AC load bank

Ø  Resistive & inductive combined AC load bank

Ø  Resistive, inductive & capacitive combined AC load bank

 

FORESIGHT series load banks protections

Standard protections:

Ø  Emergency pause operation: one-key stop loading

Ø  Over temperature alarm/protection: alarm & remove load

Ø  Fan interlock protection: loading available after fan activated

Ø  Over voltage protection: alarm & remove load

Optional protections

Ø  Blower thermal overload protection: alarm & remove load

Ø  Short circuit protection by fuse(over current protection)

Ø  Phase sequence protection(for fans with 3phase voltage)

Ø  Or other functions as requested

 

 

FORESIGHT series load bank control modes

Two control modes available for FORESIGHT series AC/DC load banks: The local panel control mode and the PC software remote control mode.

Local panel control mode available as below listed:

Ø  By contactor

Ø  By circuit breaker

Ø  Or other switches as requested

PC software remote control(optional)

FORESIGHT series AC/DC load bank remote control communication protocol would be provided for clients’ integrating the load bank into the ATE system

 

 

Technical Specifications

Model

FST-AC220V-6KW-R Resistive AC Load Bank

Load Element

Alloy resistors

Load Voltage

AC220V 1phase 2wire, 50Hz

Load Power

6KW

Load Steps

0.5KW*2, 1KW, 2KW*2(0.5KW-6KW adjustable)

Power Factor

PF=1.0

Load Accuracy

±5%

Digital Meter

Voltage, Current, Power, Frequency, Power Factor and etc.

Power Supply

220V 50Hz, single phase

Control Mode

Manual control by MCB

Wire Connections

Terminals for wire connections

Insulation Class

F

Protection Level

IP20(indoor use)

Fan Noise

75dB

Cooling Mode

Force-air cooling

Work Mode

Continuous work

Protections

Overheating/buzzer alarm, overheating/over voltage protection, emergency stop button

Ambient Temperature

-10℃~+50℃

Dimension

4U

Weight

19KG

Mobility

By handles

Humidity

≤95%

Altitude

≤2500 meters

 

 

 

 

 

Each load bank includes the standard items:

 Load Bank Main Unit--1 set

 Main Unit Power Cord--1 pcs (inside load bank)

 Products primary and secondary diagram (Products components wire connection diagram)--1 pcs (digital copy)

 User Manual--1 pcs (digital copy)

Load Bank Operation Guide

 Make sure all load bank switches and EUT(equipment under test) are POWER

OFF before connections.

 Plug in the power cord to load bank power socket

Make load cables connections between load bank connection terminals and EUT

terminals accordingly by sequence of phase A/B/C/N/PE. Make sure from one cable to another.

 Check again to make sure all load cables connection reliable.

 Load bank mains supply power on, push on the green “Power”--fans working.

 Power on the EUT

 Push on the red load steps control switch “LC”--ready to load test.

 Turn on/off the mini circuit breakers to adjust the load power.

 View data

 

 

 

 COMPANY CONTACT INFORMATION: 

 

 

SHIPPING SERVICE :