Categories

10 way PDU power distribution unit Amertica socket rack mount PDU 110V 16A 10 port America socket for server rack 1U 19"

category: Power Distribution Equipment

reference price:¥$12.88 - $13.52

Purchase quantity
- +

Ningbo Geteknet Telecom Equipment Co., Ltd.

Ms. Dong
Product details Company introduction
Parameter information
Product Description


Specification
* 110V/16A Basic Power Distribution Unit (PDU) delivers AC power to data centers, network closets, and other electricall demanding applications.
* Output: 10 port USA socket; Input: USA straight plug with 1.8m (5FT) power cord.
* Versatile rackmount options: Allow for installation of the PDU in the following configurations: 0U (vertical, under counter, and
wall mount), 1U (horizontal, vertical, under counter, and wall mount).

SPD

Maximum Allowable voltage:Varistor voltage:470V
Maximum Clamping Voltage:775V
Withstanding Surge Current:4500A
Maximum Energy:220J
Rated Power:0.6W
Temperature protection:102℃
Color
Black
Material
Plastic
Certificate
Comply with CE standard
Numbers of Sockets
10
Control
Light Switch
Rated voltage
125V
Rated current
15A
Cable
1.8M 
Scope of use
Cabinet, wall cabinet
Company Profile
Recommend Products
Product packaging
FAQ
Q1:Are you trading company or manufacturer ? A1: We are factory to manufacture the Networking products since 2001.

Q2:What’s your main products?
A2: Basically we manufacture RJ45 Keystone jack , patch panel , patch cord , and kinds of boxes for copper system and fiber system solution . meanwhile we do trading serves and the 3rd party QC service for our parnters.

Q3:Where is your factory located? How can I visit there? A3: We located in Ningbo which is closed to Shanghai. It’s an important port city in the east of China. You can fly to Ningbo airport or come from Shanghai, welcome to visit us.

Q4:Do you provide samples ? A4: Yes, we offer a sample for free charge for some items, but do not pay the cost of freight.

Q5:How long is the lead time? A5: For the goods we have in stock, lead time will be within 3-5days, If not it will be 15-20 days according to quantity of the order.

Q6:What is your terms of payment? A6: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment. Please feel free to contact us for the terms for partner
Q7:Can I print my own logo on your products? A7: Yes,of course. OEM is acceptable if the quantity can reach MOQ. We also do ODM basis on customer’s requirement.