Categories

CNC Solar Energy PV System 1P 2P 3P 4P 1a~80a DC MCB 250V 500V 1000V DC C80 mcb mini circuit breaker/ mcb 2pole 4pole

category: Circuit Breakers

reference price:¥$0.54 - $0.63

Purchase quantity
- +

Changcheng Electrical Group Zhejiang Technology Co., Ltd.

Ms. Zhu
Product details Company introduction
Parameter information








 

 

Product Description

CNC Solar Energy PV System 1P 2P 3P 4P 1a~80a DC MCB 250V 500V 1000V DC C80 mcb mini circuit breaker/ mcb 2pole 4pole

special extinguishing and current limiting system, which can quickly switch off the fault current of the DC distribution system, to protect photovoltaic module

Product Detail

Rated operational voltage(Ue) DC 250V,500V,750V,1000V
Number of poles: 1P, 2P, 3P, 4P
Rated current In(A) 1, 2, 3, 4, 6, 10, 16, 20, 25, 32, 40, 50, 63, 80
Mechanical life (times) 20000
Electrical life (times) 10000
Accessory Shunt release, Under voltage release
Standard: IEC/EN 60947-2
Product Keywords solar dc circuit breaker dc mcb,solar circuit breaker,pv dc mcb

General

YCB9-80DM DC series circuit breaker is specially used for the photovoltaic system,it’s rated working voltage can be up to DC1000V. The circuit breaker adopts aspecial extinguishing and current limiting system, which can quickly switch off thefault current of the DC distribution system, to protect photovoltaic module, theimportant component in solar power generation system from the harm of high DCreverse current and AC feedback current caused by inverter failure, and ensure thereliable operation of solar photovoltaic power generation system.

Standard: IEC/EN 60947-2.


Operation conditions

Ambient temperature:-25℃~+40℃,the average during 24 hours should notexceed +35℃;if more than +40℃ or less than -25℃, contact with manufacturer;

The atmosphere condition: ≤95%

Altitude:≤2000m, if exceed 2000m,altitude derating is required;

Pollution degree: II

Packaging & Shipping

Company Information

ABOUT US

The Changcheng Electrical Group Co,.Ltd ,specialized in manufacturing industrial electrical appliance.
CNC holds assets with more than 5 billion RMB,and the plant area amounts to 0.25 million square meters,with over 10,000 emplyees.

CNC   Deliver Power For Better Life!

History

1988

Originate the Yueqing ChangCheng Electrical Components Factory

1995

Established Zhejiang Changcheng Electrical Group

 

1997

Became a national non-regional group,and passed the ISO9000 system

2007

Shanghai Industrial Zone was completed as manufacture plant for transformer and switchgear.

Our Advantages

OUR ADVANTAGES

 
 

PROFESSIONAL

1.Have 31 years experience in electrical . More than 15 engineer in factory, 
2.We divide sales areas for salesmen to better serve customer :Europe/Russian/Africa... 

High Quanlity (Q&C)

1.We set up advanced assembly line,test center, R&D Center and quality control center.
2.We have got the certificates of ISO9011,CE,
SEMKO,KEMA,Rohs,UL...

R&D

1.We have strong R&D capability
2.New designed products are developed every year by R&D

Strength

China Top 500 Enterprise
China Key Industrial Electrical Laboratory

Provincial Industrial Design Center Of China

FAQ

FAQ

1. Could I have prices of your products?

Welcome. Pls feel free to send us an email here. You will get our reply in 24 hours

2. Can we print our logo/website/company name on products?

Yes, please advise the size and Pantone Code of the logo.

3. What's the lead time for regular order?

7-15 days for order quantity lower than 5000pc; For more quantity, usually 20 days.

4. Can I get a sample before the bulk order?

Yes, we welcome sample order to test and check quality.Mixed samples are acceptable.

5. Do you inspect the finished products?

Yes, each step of production and finished products will be came out inspection by QC department before shipping.